Subjects under Queensland University of Technology
Document Details

ENB382 Complete Study Notes for Final Exam

User Description:
This document includes all the examinable points from the lectures, as well as examples of work and key points.

Thinkswap Satisfaction Guarantee

Each document purchased on Thinkswap is covered by our Satisfaction Guarantee policy. If you are not satisfied with the quality of any document, or you believe the document was incorrectly described or categorised, Thinkswap will provide a full refund of exchange credits so you can check out another document. For more information please click here.

This student studied:
Claim a Thinkswap Bounty

Do you know if the Subject listed above has changed recently? Click report to earn free Exchange Credits!

Document Information:
22 Pages Complete Study Notes < 1 Year old
Share

5 Ex Credits


Document Screenshots:
Topics this document covers:
Project management Construction Business Economy Cost estimate Formwork Work breakdown structure Overhead Earned value management General contractor Concrete Schedule
This is a Complete Set of Study Notes

Complete Study Notes typically cover at least half a semester’s content or several topics in greater depth. They are typically greater than 20 pages in length and go into more detail when covering topics.

What are Exchange Credits:

Exchange Credits represent the worth of each document on Thinkswap. In exchange for uploading documents you will receive credits. These can then be used to checkout other documents on Thinkswap.

Topics this document covers:
Project management Construction Business Economy Cost estimate Formwork Work breakdown structure Overhead Earned value management General contractor Concrete Schedule
Sample Text:
accuracy -­‐ Level of detail -­‐ Risk -­‐ Opportunities -­‐ Key assumptions -­‐ Time related costs -­‐ Production related costs Exam Q Key participants in projects -­‐ Owner (own/use the project) -­‐ Banker (provide finance) -­‐ Designer (prepares design) -­‐ Owners project team (overall responsibility for delivering the project and satisfying stakeholders) -­‐ Contractor (accepts certain responsibilities, risks, rewards and builds the project) -­‐ Other stakeholders (individuals and groups affected by the project) ________________ Estimators Role -­‐ Imagination and flair (construction method, scheduling, falsework and concept design) -­‐ Process and discipline (following a process, all maths in the estimate) Why is ...
Similar Documents to ENB382 Complete Study Notes for Final Exam

Project Management Exam Notes

This student studied:
Western Sydney University - 300727 - Project Managment

These notes are detailed for the project management final exam . includes all topics covered in the unit and is to be tested.

1 Ex Credit

View Details

Project Management Assignment

This student studied:
Western Sydney University - 300727 - Project Managment

This project management assignment is for an aged care facility construction project to commence. The mark achieved was 24/30 .

2 Ex Credits

View Details

Complete Note for Site Management

This student studied:
University of Technology Sydney - 16912 - Construction Project Management Principles

This complete study note summarized all the important information needed for the exam and knowledge.

5 Ex Credits

View Details

Project Plan

This student studied:
University of Adelaide - PROJMGNT5021 - Applied Project Management

This is a case study project plan completed as part of the applied project management course.

2 Ex Credits

View Details